AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM F1233-08) TESTING SEQUENCE

Test Implements SEQUENCE
CLASS I CLASS II CLASS III CLASSᅠ IV CLASS V
TOTAL FORCED ENTRY SEQUENCES 1 7 16 27 41
Blunt Impacting (impacts)
Sledge Hammer (25) N/A 5 10,16 19,22,27 30,33,36,
39
4″ (10cm) Diameter Pipe/Sledge (25) N/A N/A 9 18 29
Ram(10) N/A N/A 8 17 28
Ball Peen Hammer (10) 1 2 N/A N/A N/A
Sharp Tool (impacts)
Ripping Bar (10) N/A 7 12 23 N/A
Chisel/Hammer (25) N/A N/A 13 25 35,40
Angle Iron/Sledge (25) N/A N/A 15 N/A N/A
1 1/2″ (4cm) Diameter Pipe Sledge (25) N/A 3 N/A N/A N/A
Fire Axe (25) N/A N/A N/A 24 32,38
Wood Splitting Maul (25) N/A N/A N/A 21 34,41
Thermal Stress (minutes)
Extinguisher, CO2 (1) N/A 4 N/A N/A N/A
Propane Torch (5) N/A 6 11 20 31
Chemical Deterioration (amount)
Gasoline (1/2 Pint) (1/4 Liter) N/A N/A 14 N/A N/A
Acetone (1/2 Pint) (1/4 Liter) N/A N/A N/A 26 37

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM F1915-05)

 

Security Grade Time Rating Sequence 1 Blunt Impactor Sequence 2 Sharp Impactor Sequence 3 Blunt Impactor Total Impacts
1 60 minutes 150 300 150 600
2 40 minutes 100 200 100 400
3 20 minutes 50 100 50 200
4 10 minutes 25 50 25 100

HP WHITE-TP-0500.03 (FORCED ENTRY TEST PROCEDURE) TESTING SEQUENCE

LEVEL I LEVEL II LEVEL III LEVEL IV LEVEL V
TOTAL FORCED ENTRY SEQUENCES 5 15 26 39 54
(a) Pinch or ripping may be substituted for any portion of Blunt Impacting Sequence at rate of 1 minute for each 5 impacts (Test Director Option)
(b) Additional sequences of one minute intervals in conjunction with all Sharp Tool Sequences except sequences 5 and 15 (re: Test Protocol HPW-TP-0500.03 paragraphs 3.5.7 and 3.5.8)
TEST IMPLEMENTS: Blunt Impacting (impacts)
Sledgehammer/Wedge (25) 1, 4 8, 10 18, 24, 26 29, 32, 39 42, 45, 48, 51, 54
4″ Diameter pipe/Sledge (25) 2 7 17 28 41
Ram (10) N/A 6 16 27 40
Pinch Bar (a)
TEST IMPLEMENTS: Sharp Tool (Impacts)
Chisel/Hammer (25) N/A 12 21,23 33,36,38 47,52
Angle Iron/Sledge (25) N/A 13 22 N/A N/A
1 1/2″ Diameter Pipe/Sledge (25) 5 N/A N/A N/A N/A
Fire Axe (25) N/A N/A N/A 35 44,50
Wood Maul (25) N/A 15 20 31 46,53
Compass Saw (b), Hacksaw (b)
TEST IMPLEMENTS: Thermal Stress (minutes)
Extinguisher, CO2 (1) 3 9 N/A N/A N/A
Propane Torch (5) N/A 11 19 30 N/A
Acetylene Torch (5) N/A N/A N/A N/A 43
TEST IMPLEMENTS: Chemical Deterioration (amount)
Gasoline (8 oz) N/A 14 N/A N/A N/A
Windshield Washer (8 oz) N/A N/A 25 34 N/A
Acetone (8 oz) N/A N/A N/A 37 49

F.WALKER, MCGOUGH, FOLTZ AND LYERIA (WMFL) TEST PROCEDURE (BALLISTIC/PHYSICAL/FLAME ATTACK)

ATTACK SEQUENCE SUMMARY LEVEL I BALLISTIC AND 60 MINUTES PHYSICAL ATTACK LEVEL II 60 MINUTES PHYSICAL ATTACK LEVEL III 30 MINUTES PHYSICAL ATTACK
.44 Magnum, 240 Grain 25 rounds N/A N/A
2 lb. Claw Hammer 5 minutes 5 minutes 5 minutes
10 lb. Sledgehammer 5 minutes 5 minutes 5 minutes
Cold Chisel/Screwdriver 5 minutes 5 minutes 5 minutes
1-1/2″ x 3′ pipe with 2″ x 2″ x 3′ angle iron 5 minutes 5 minutes N/A
#8 Reinforcing Bar, 3′ long 5 minutes 5 minutes N/A
4″ x 4″ x 3′ Long (oak) leg 5 minutes 5 minutes N/A
Fire extinguisher (chemical dry) 5 minutes 5 minutes 5 minutes
10 lb. Sledgehammer 5 minutes 5 minutes N/A
Clothes Hanger/Knife, Heated 10″ Blade 1/4″ Thick 5 minutes 5 minutes N/A
Propane Burner, (2,200°F) 5 minutes 5 minutes 5 minutes
4 lb. Hammer 5 minutes 5 minutes 5 minutes
3″ x 3′ Pipe with 1″ x 1″ x 3′ Angle Iron 5 minutes 5 minutes N/A