AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM F1233-08) TESTING SEQUENCE

Test ImplementsSEQUENCE
CLASS ICLASS IICLASS IIICLASSᅠ IVCLASS V
TOTAL FORCED ENTRY SEQUENCES17162741
Blunt Impacting (impacts)
Sledge Hammer (25)N/A510,1619,22,2730,33,36,
39
4″ (10cm) Diameter Pipe/Sledge (25)N/AN/A91829
Ram(10)N/AN/A81728
Ball Peen Hammer (10)12N/AN/AN/A
Sharp Tool (impacts)
Ripping Bar (10)N/A71223N/A
Chisel/Hammer (25)N/AN/A132535,40
Angle Iron/Sledge (25)N/AN/A15N/AN/A
1 1/2″ (4cm) Diameter Pipe Sledge (25)N/A3N/AN/AN/A
Fire Axe (25)N/AN/AN/A2432,38
Wood Splitting Maul (25)N/AN/AN/A2134,41
Thermal Stress (minutes)
Extinguisher, CO2 (1)N/A4N/AN/AN/A
Propane Torch (5)N/A6112031
Chemical Deterioration (amount)
Gasoline (1/2 Pint) (1/4 Liter)N/AN/A14N/AN/A
Acetone (1/2 Pint) (1/4 Liter)N/AN/AN/A2637

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM F1915-05)

Security GradeTime RatingSequence 1 Blunt ImpactorSequence 2 Sharp ImpactorSequence 3 Blunt ImpactorTotal Impacts
160 minutes150300150600
240 minutes100200100400
320 minutes5010050200
410 minutes255025100

HP WHITE-TP-0500.03 (FORCED ENTRY TEST PROCEDURE) TESTING SEQUENCE

LEVEL ILEVEL IILEVEL IIILEVEL IVLEVEL V
TOTAL FORCED ENTRY SEQUENCES515263954
(a) Pinch or ripping may be substituted for any portion of Blunt Impacting Sequence at rate of 1 minute for each 5 impacts (Test Director Option)
(b) Additional sequences of one minute intervals in conjunction with all Sharp Tool Sequences except sequences 5 and 15 (re: Test Protocol HPW-TP-0500.03 paragraphs 3.5.7 and 3.5.8)
TEST IMPLEMENTS: Blunt Impacting (impacts)
Sledgehammer/Wedge (25)1, 48, 1018, 24, 2629, 32, 3942, 45, 48, 51, 54
4″ Diameter pipe/Sledge (25)27172841
Ram (10)N/A6162740
Pinch Bar (a)
TEST IMPLEMENTS: Sharp Tool (Impacts)
Chisel/Hammer (25)N/A1221,2333,36,3847,52
Angle Iron/Sledge (25)N/A1322N/AN/A
1 1/2″ Diameter Pipe/Sledge (25)5N/AN/AN/AN/A
Fire Axe (25)N/AN/AN/A3544,50
Wood Maul (25)N/A15203146,53
Compass Saw (b), Hacksaw (b)
TEST IMPLEMENTS: Thermal Stress (minutes)
Extinguisher, CO2 (1)39N/AN/AN/A
Propane Torch (5)N/A111930N/A
Acetylene Torch (5)N/AN/AN/AN/A43
TEST IMPLEMENTS: Chemical Deterioration (amount)
Gasoline (8 oz)N/A14N/AN/AN/A
Windshield Washer (8 oz)N/AN/A2534N/A
Acetone (8 oz)N/AN/AN/A3749

F.WALKER, MCGOUGH, FOLTZ AND LYERIA (WMFL) TEST PROCEDURE (BALLISTIC/PHYSICAL/FLAME ATTACK)

ATTACK SEQUENCE SUMMARYLEVEL I BALLISTIC AND 60 MINUTES PHYSICAL ATTACKLEVEL II 60 MINUTES PHYSICAL ATTACKLEVEL III 30 MINUTES PHYSICAL ATTACK
.44 Magnum, 240 Grain25 roundsN/AN/A
2 lb. Claw Hammer5 minutes5 minutes5 minutes
10 lb. Sledgehammer5 minutes5 minutes5 minutes
Cold Chisel/Screwdriver5 minutes5 minutes5 minutes
1-1/2″ x 3′ pipe with 2″ x 2″ x 3′ angle iron5 minutes5 minutesN/A
#8 Reinforcing Bar, 3′ long5 minutes5 minutesN/A
4″ x 4″ x 3′ Long (oak) leg5 minutes5 minutesN/A
Fire extinguisher (chemical dry)5 minutes5 minutes5 minutes
10 lb. Sledgehammer5 minutes5 minutesN/A
Clothes Hanger/Knife, Heated 10″ Blade 1/4″ Thick5 minutes5 minutesN/A
Propane Burner, (2,200°F)5 minutes5 minutes5 minutes
4 lb. Hammer5 minutes5 minutes5 minutes
3″ x 3′ Pipe with 1″ x 1″ x 3′ Angle Iron5 minutes5 minutesN/A